CES carried out Root Cause Analysis (RCA) of crane failures to support the STS crane structural integrity at PTP. Part of the inspections included 4 STS crane fast scans based on the hot spot/failure on the forestay bars.

CES also launched a 3-year (electrification) upgrade project on 117 RTGs, including cranes from ZPMC, Mitius, and Noell. Part of this upgrade included 60 RTG electrification retrofits, including installation support, testing and commissioning.

CES’s ability to plan and manage electrification projects, using the latest technology, makes us stand out globally.

Scope of Work

  • Structural inspection
  • Electrification upgrade
  • Crane lifetime analysis & consultation